Generate the full PPAP pack from CadNexa. AS9102, balloon drawings, capability data — all in one workflow. Tata, Mahindra, Bajaj variations included.
Try in CadNexa →

Submission Level:

0%
SUBMISSION READINESS

Add your status to track readiness

Required
Complete
—%
Ready

Indian OEM variations

  • Tata Motors: Requires additional Lab Capability Survey + supplier ranking sheet (Level 3+)
  • Mahindra & Mahindra: Material composition certificate must be from NABL-accredited lab
  • Bajaj Auto: Run-at-rate (300-piece capability run) replaces standard Initial Process Study at Level 3
  • Maruti Suzuki: Customer-specific MIS (Material Information Sheet) and IMDS submission required
  • Hero MotoCorp: Q-Wall checklist + dimensional layout in Hero-prescribed format

What is PPAP?

PPAP (Production Part Approval Process) is the AIAG-defined process for proving to your customer that you can consistently produce parts meeting all specifications. It's the gate between prototype and production volume — and you can't ship without it.

The 18 PPAP Elements (AIAG 4th Edition)

  1. Design Records
  2. Authorized Engineering Change Documents
  3. Customer Engineering Approval
  4. Design FMEA
  5. Process Flow Diagram
  6. Process FMEA (PFMEA)
  7. Control Plan
  8. Measurement System Analysis (MSA / Gauge R&R)
  9. Dimensional Results
  10. Records of Material / Performance Tests
  11. Initial Process Studies (Cp/Cpk)
  12. Qualified Laboratory Documentation
  13. Appearance Approval Report (if applicable)
  14. Sample Production Parts
  15. Master Sample
  16. Checking Aids
  17. Customer-Specific Requirements
  18. Part Submission Warrant (PSW)

PPAP Submission Levels

Most Common PPAP Rejection Reasons

  1. Stale drawing revision — Element 1 must match the released customer drawing exactly.
  2. Insufficient capability data — Element 11 needs Cpk ≥ 1.33 from real production runs, not a single sample.
  3. Weak MSA — Element 10 must show the gauge is capable for the tolerance being measured.
  4. Missing PFMEA links — Element 6 must connect failure modes to specific Control Plan items in Element 7.
  5. Unsigned PSW — Element 18 requires signatures from Quality, Engineering, and authorized personnel.

Indian Customer Variations

Each major Indian OEM has slightly different PPAP requirements:

Workflow Tools

PPAP draws from many tools — run Cp/Cpk studies for Element 11, Gauge R&R for Element 10, FMEA RPN analysis for Element 6, and AQL sampling plans for ongoing control. For aerospace customers, the AS9102 Form 3 covers similar ground.